Who pays for a dividing fence?
Neighbours usually split a sufficient dividing fence 50/50. If you want something better, you pay the difference.
Source: Official source · checked 17 Nov 2026
Victoria · local fence rules · checked 17 Nov 2026
Most fences here don’t need council approval: front fences up to 1.5 m and side or rear fences up to 2 m. Neighbours split a dividing fence 50/50.
Neighbours usually split a sufficient dividing fence 50/50. If you want something better, you pay the difference.
Source: Official source · checked 17 Nov 2026
Up to 1.5 m within 3 m of the street (2 m on a declared main road), unless your planning zone sets a lower limit, sometimes 1.2 m.
Source: Official source · checked 17 Nov 2026
Side and rear fences under 2 m, more than 3 m from the front boundary, usually need no building permit. Masonry front fences over 1.2 m often do.
Source: Official source · checked 17 Nov 2026
Any pool or spa that can hold more than 30 cm of water needs a compliant barrier and must be registered with council. Barriers are re-inspected every 4 years.
Council page: "Pool and spa barriers Pool and spa safety barriers save lives." "That's why new laws require local pool and spa owners to register with us by 1 November 2020 and get their barrier checked every 4 years."Source ↗ · checked 17 Nov 2026
Source: Official source · checked 17 Nov 2026
About 14% of Banyule is a designated Bushfire Prone Area. Building work there needs at least BAL 12.5. The Bushfire Management Overlay also applies in parts, which can trigger a planning permit. Check your address on VicPlan.
The Banyule Planning Scheme applies the Bushfire Management Overlay (BMO) to 1 mapped areas. Buildings and works in the BMO generally need a planning permit; fencing materials may be constrained.Source ↗ · checked 16 Nov 2026
Parts of Banyule are a designated Bushfire Prone Area: about 882 ha, roughly 14.1% of the municipality (BPA map LEGL./24-174, gazetted 10/09/2024). Building work in a BPA needs a minimum BAL 12.5 under AS 3959; the BAL is assessed per site.Source ↗ · checked 16 Nov 2026
Source: Official source · checked 17 Nov 2026
The Banyule planning scheme maps 232 Heritage Overlay areas. A planning permit is often needed to build or change a front fence there.
The Banyule Planning Scheme has 232 Heritage Overlay areas mapped. In a Heritage Overlay a planning permit is often required to build or change a front fence; check the property and the overlay schedule.Source ↗ · checked 16 Nov 2026
Source: Official source · checked 17 Nov 2026
Greensborough has the most published lot data in Banyule.
| Fence | Price per metre | Your 50/50 share |
|---|---|---|
| Treated pine paling in Greensborough | $140–$150/m | $6,710–$7,080 |
| Colorbond steel in Greensborough | $170–$180/m | $7,830–$8,250 |
Side and rear fences under 2 m, more than 3 m from the front boundary, usually need no building permit. Masonry front fences over 1.2 m often do.
Neighbours usually split a sufficient dividing fence 50/50. If you want something better, you pay the difference.
Any pool or spa that can hold more than 30 cm of water needs a compliant barrier and must be registered with council. Barriers are re-inspected every 4 years.
About 14% of Banyule is a designated Bushfire Prone Area. Building work there needs at least BAL 12.5. The Bushfire Management Overlay also applies in parts, which can trigger a planning permit. Check your address on VicPlan.
Treated pine paling is $140–$150/m. Your half of a typical dividing fence is $6,710–$7,080.
Email [email protected]. Check the council website for current contact details.
Compare local quotes with the typical price in Greensborough.
Rule headings use published category labels. Official sources should be checked before building. General information only. These are estimates, not quotes, and not legal, planning, building or financial advice. Check your own title, council and neighbour situation before you build.