Who pays for a dividing fence?
Neighbours usually split a sufficient dividing fence 50/50. If you want something better, you pay the difference.
Source: Official source · checked 17 Nov 2026
Victoria · local fence rules · checked 17 Nov 2026
Most fences here don’t need council approval: front fences up to 1.5 m and side or rear fences up to 2 m. Neighbours split a dividing fence 50/50.
Neighbours usually split a sufficient dividing fence 50/50. If you want something better, you pay the difference.
Source: Official source · checked 17 Nov 2026
Up to 1.5 m within 3 m of the street (2 m on a declared main road), unless your planning zone sets a lower limit, sometimes 1.2 m.
Source: Official source · checked 17 Nov 2026
Side and rear fences under 2 m, more than 3 m from the front boundary, usually need no building permit. Masonry front fences over 1.2 m often do.
Council page: "Council will only agree to share the cost of a standard fence (up to 2m in height)."Source ↗ · checked 17 Nov 2026
The Maroondah Planning Scheme applies a Neighbourhood Character Overlay in 11 mapped areas; some schedules control front fence height or style.Source ↗ · checked 16 Nov 2026
Source: Official source · checked 17 Nov 2026
Any pool or spa that can hold more than 30 cm of water needs a compliant barrier and must be registered with council. Barriers are re-inspected every 4 years.
Council page: "Building permit register Building permits Apply for a building permit Owner builders Building permit for swimming pools and spas Energy efficiency and sustainability Build over an easement Asset protection Skip bins, bulk waste and shipping containers Hoarding Demolition Onsite Wastewater Management" "The Building Permit documentation must include: a site plan showing location of swimming pool or spa, barriers, and any existing buildings on site the type and location of the safety barriers, including fences, gates, doors, windows, latches, catches, self-closing devices and mesh screens details of"Source ↗ · checked 17 Nov 2026
Source: Official source · checked 17 Nov 2026
About 12% of Maroondah is a designated Bushfire Prone Area. Building work there needs at least BAL 12.5. The Bushfire Management Overlay also applies in parts, which can trigger a planning permit. Check your address on VicPlan.
The Maroondah Planning Scheme applies the Bushfire Management Overlay (BMO) to 7 mapped areas. Buildings and works in the BMO generally need a planning permit; fencing materials may be constrained.Source ↗ · checked 16 Nov 2026
Parts of Maroondah are a designated Bushfire Prone Area: about 757 ha, roughly 12.3% of the municipality (BPA map LEGL./17-392, gazetted 02/06/2017). Building work in a BPA needs a minimum BAL 12.5 under AS 3959; the BAL is assessed per site.Source ↗ · checked 16 Nov 2026
Source: Official source · checked 17 Nov 2026
The Maroondah planning scheme maps 168 Heritage Overlay areas. A planning permit is often needed to build or change a front fence there. A Neighbourhood Character Overlay can also control front fence height or style.
Council page: "If your property is in one of the below zones or overlays a planning permit may be required to build a fence anywhere on your property: Urban Floodway Zone Neighbourhood Character Overlay Design Development Overlay Heritage Overlay Special Building Overlay Check the VicPlan website and find your Planning Scheme Zones and Overlays."Source ↗ · checked 17 Nov 2026
The Maroondah Planning Scheme has 168 Heritage Overlay areas mapped. In a Heritage Overlay a planning permit is often required to build or change a front fence; check the property and the overlay schedule.Source ↗ · checked 16 Nov 2026
Source: Official source · checked 17 Nov 2026
Croydon has the most published lot data in Maroondah.
| Fence | Price per metre | Your 50/50 share |
|---|---|---|
| Treated pine paling in Croydon | $140–$150/m | $7,440–$7,860 |
| Colorbond steel in Croydon | $170–$180/m | $8,690–$9,150 |
Side and rear fences under 2 m, more than 3 m from the front boundary, usually need no building permit. Masonry front fences over 1.2 m often do.
Neighbours usually split a sufficient dividing fence 50/50. If you want something better, you pay the difference.
Any pool or spa that can hold more than 30 cm of water needs a compliant barrier and must be registered with council. Barriers are re-inspected every 4 years.
About 12% of Maroondah is a designated Bushfire Prone Area. Building work there needs at least BAL 12.5. The Bushfire Management Overlay also applies in parts, which can trigger a planning permit. Check your address on VicPlan.
Treated pine paling is $140–$150/m. Your half of a typical dividing fence is $7,440–$7,860.
Email [email protected]. Check the council website for current contact details.
Compare local quotes with the typical price in Croydon.
Rule headings use published category labels. Official sources should be checked before building. General information only. These are estimates, not quotes, and not legal, planning, building or financial advice. Check your own title, council and neighbour situation before you build.