Who pays for a dividing fence?
Neighbours usually split a sufficient dividing fence 50/50. If you want something better, you pay the difference.
Source: Official source · checked 17 Nov 2026
Victoria · local fence rules · checked 17 Nov 2026
Most fences here don’t need council approval: front fences up to 1.5 m and side or rear fences up to 2 m. Neighbours split a dividing fence 50/50.
Neighbours usually split a sufficient dividing fence 50/50. If you want something better, you pay the difference.
Source: Official source · checked 17 Nov 2026
Front fences within 3 m of the street need a building permit above 1.5 m. Corner fences need one above 1 m within 9 m of the intersection.
Council page: "You need a building permit when: Installing a side or rear boundary fence more than 2m high." "Installing a front fence which is more than 1.5m high and is within 3.0m of the street." "Installing a corner fence that is more than 1.0m high and is within 9.0m of intersecting streets."Source ↗ · checked 17 Nov 2026
Source: Official source · checked 17 Nov 2026
Side and rear fences under 2 m, more than 3 m from the front boundary, usually need no building permit. Masonry front fences over 1.2 m often do.
Source: Official source · checked 17 Nov 2026
Any pool or spa that can hold more than 30 cm of water needs a compliant barrier and must be registered with council. Barriers are re-inspected every 4 years.
Council page: "Swimming Pool Safety Barriers and Registration Pools and spa pools capable of holding water deeper than 300mm must be registered with Council." "Pool owners must lodge with Council a certificate of barrier compliance (Form 23) issued by a Building Inspector or Surveyor."Source ↗ · checked 17 Nov 2026
Source: Official source · checked 17 Nov 2026
About 75% of Hume is a designated Bushfire Prone Area. Building work there needs at least BAL 12.5. The Bushfire Management Overlay also applies in parts, which can trigger a planning permit. Check your address on VicPlan.
The Hume Planning Scheme applies the Bushfire Management Overlay (BMO) to 8 mapped areas. Buildings and works in the BMO generally need a planning permit; fencing materials may be constrained.Source ↗ · checked 16 Nov 2026
Parts of Hume are a designated Bushfire Prone Area: about 37,788 ha, roughly 75.1% of the municipality (BPA map LEGL./25-369, gazetted 12/02/2026). Building work in a BPA needs a minimum BAL 12.5 under AS 3959; the BAL is assessed per site.Source ↗ · checked 16 Nov 2026
Source: Official source · checked 17 Nov 2026
The Hume planning scheme maps 195 Heritage Overlay areas. A planning permit is often needed to build or change a front fence there.
The Hume Planning Scheme has 195 Heritage Overlay areas mapped. In a Heritage Overlay a planning permit is often required to build or change a front fence; check the property and the overlay schedule.Source ↗ · checked 16 Nov 2026
Source: Official source · checked 17 Nov 2026
Craigieburn has the most published lot data in Hume.
| Fence | Price per metre | Your 50/50 share |
|---|---|---|
| Treated pine paling in Craigieburn | $140–$150/m | $5,470–$5,780 |
| Colorbond steel in Craigieburn | $170–$180/m | $6,380–$6,730 |
Side and rear fences under 2 m, more than 3 m from the front boundary, usually need no building permit. Masonry front fences over 1.2 m often do.
Neighbours usually split a sufficient dividing fence 50/50. If you want something better, you pay the difference.
Any pool or spa that can hold more than 30 cm of water needs a compliant barrier and must be registered with council. Barriers are re-inspected every 4 years.
About 75% of Hume is a designated Bushfire Prone Area. Building work there needs at least BAL 12.5. The Bushfire Management Overlay also applies in parts, which can trigger a planning permit. Check your address on VicPlan.
Treated pine paling is $140–$150/m. Your half of a typical dividing fence is $5,470–$5,780.
Email [email protected]. Check the council website for current contact details.
Compare local quotes with the typical price in Craigieburn.