Who pays for a dividing fence in Western Australia?
Neighbours split the cost of a dividing fence, and its repairs, 50/50.
Typical contribution
50/50
Dividing Fences Act 1961 (WA)
NoticeServe a notice to fence. If you don't agree within 21 days, either owner can apply to the Magistrates Court.
UpgradeRequesting owner usually pays the extra
01How to start
How to start a dividing fence
Talk with your neighbour about the boundary, materials and cost.
Give the required fencing notice and allow the response period.
Get written quotes and agree on the work before installation.
If you cannot agree, follow the state dispute process in the official wording.
02Other rules
Other Western Australia dividing fence rules
Read the official wording
When you need a building permit
No building permit is needed for a fence built in line with the council fencing local law, or, where there is no such local law, a masonry fence up to 0.75 m or a fence of other material up to 1.8 m (outside wind regions C and D). Pool barriers are excluded.
The Map of Bush Fire Prone Areas, designated by the Fire and Emergency Services Commissioner, identifies land where bushfire planning and building requirements (SPP 3.7, AS 3959) apply.
Under the R-Codes deemed-to-comply provisions, front fences within the primary street setback must be visually permeable above 1.2 m of natural ground level, to a maximum of 1.8 m; solid pillars up to 1.8 m are allowed if no larger than 450 mm x 450 mm. Local planning policies can vary this.
All private pools and spas able to hold more than 300 mm of water must have a safety barrier (AS 1926.1-2012 / AS 1926.2-2007 for pools after 1 May 2016). The local government inspects barriers, with no more than four years between inspections, and must inspect new pools within 30 days of completion.