Timber or steel dividing fences under 2.0 m, and further than 3 m from the front boundary, typically need no building permit. Over 2 m, or in some overlays, a planning or building permit may be required.
The Bushfire Management Overlay (BMO) is a separate planning overlay for higher hazard and triggers a planning permit. Construction and material choices may be constrained; point to a practitioner rather than a fence construction table.
A Designated Bushfire Prone Area means a minimum BAL of 12.5 under AS 3959 for relevant building work. The site BAL is assessed; it is not a single value read from the overlay.
A front fence within 3 m of a street alignment is generally limited to 1.5 m, or 2 m on a declared road, unless a planning scheme zone schedule sets another height (sometimes 1.2 m).
In a Heritage Overlay a planning permit is often required to construct or alter a front fence, and local guidance frequently asks for a lower, more open fence.
New work generally must comply with AS 1926.1–2012, with self-closing, self-latching gates. A new outdoor pool area must not be directly accessible from a building.
After installation the barrier is inspected by a registered building surveyor, building inspector or pool inspector; the certificate of barrier compliance is lodged with council within 30 days, and the barrier is re-inspected every four years.
The applicable standard can depend on the pool's construction date (older pools may sit under earlier standards or Building Regulations Part 9A / reg 147C). A paling fence is not automatically a legal pool barrier.
Any pool or spa that can hold more than 30 cm of water must have a compliant barrier, whether or not young children live there, and must be registered with the local council.