Neighbours generally share the cost of an adequate dividing fence equally.
Typical contribution
50/50
Fences Act 1975 (SA)
NoticeServe a Form 1 or Form 2 notice and wait 30 days. Your neighbour can object with a cross-notice. Then work needs agreement or a Magistrates Court order.
UpgradeRequesting owner usually pays the extra
01How to start
How to start a dividing fence
Talk with your neighbour about the boundary, materials and cost.
Give the required fencing notice and allow the response period.
Get written quotes and agree on the work before installation.
If you cannot agree, follow the state dispute process in the official wording.
02Other rules
Other South Australia dividing fence rules
Read the official wording
When you need a building permit
A fence is generally exempt from development approval up to 2.1 m high (measured from the lower of the two finished ground levels), or 1 m if masonry (brick, stone, concrete or masonry piers). Approval is needed for higher fences, a fence over 1 m within 6 m of a road intersection (unless a corner cut-off applies), pool safety fences, fences for heritage places or in historic areas, and brush fences close to dwellings.
Bushfire-prone areas are set by the Planning and Design Code Hazards (Bushfire) overlays (general, medium and high risk, and urban interface). Building in these areas must meet Ministerial Building Standard MBS 008, including a BAL under AS 3959 where required. Check the overlay for an address with the PlanSA property lookup.
A fence higher than 1 m within 6 m of the intersection of two road boundaries needs development approval (Barossa Council notes the exception where a 4 m x 4 m corner cut-off exists).
Pools and spas must have a permanent safety barrier at least 1.2 m high that children cannot climb over or crawl under; a boundary fence forming part of the barrier must be 1.8 m high on the pool side with a 900 mm non-climbable zone; gates must swing outward and self-close and self-latch. Pool fences need development approval with the pool. When selling, no certificate is needed for an existing pool, but pools built before 1 July 1993 must meet Ministerial Building Standard MBS 004 before settlement.
Neighbours generally share the cost of an adequate dividing fence equally.
How do I give a fencing notice in South Australia?
Serve a Form 1 or Form 2 notice and wait 30 days. Your neighbour can object with a cross-notice. Then work needs agreement or a Magistrates Court order.
Can I choose a more expensive fence in South Australia?
The owner who requests an upgrade may need to pay the difference. Agree with your neighbour before work starts.
NextLocal quotes
Get quotes for a dividing fence in South Australia
Compare a sufficient-fence estimate with local quotes.
Tell us the suburb, fence and length. It takes about 2 minutes.
We send it to up to 3 local fencers. Free for homeowners.
Compare their quotes with the estimate above. You choose who to hire.